Covid 19 Movement Strategy

Project: Covid 19 Movement Strategy, London, City of Westminster

Location: London

Client: Westminster City Council

Services: Project Management

Since the initial Lockdown of the UK in March 2020, Kraven Consulting has been supporting Westminster City Council and FM Conway in overseeing the design and implementation of over fifty Temporary Traffic interventions throughout the City of Westminster. This included the widening of footway by utilising the carriageways, reducing traffic speeds using traffic calming measures, suspension of parking and loading bays, provisions of additional cycle lanes and cycle parking. The project also included the closures of whole areas for hospitality including Soho and Covent Garden.

Following the initial interventions Kraven Consulting has been involved in enhancing the temporary traffic measures with a more semi permanent schemes, including the £2.7m Regent Street Enhanced Temporary Scheme for The Crown Estate and Westminster City Council.

We Make It

Latest Projects

Idea

First Step

Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore.

Design

Second Step

Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore.

Develop

Third Step

Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore.

Result

Fourth Step

Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore.

Get In Touch

Contact Kraven Consulting

Your message has been sent successfully.
Sorry, error occured this time sending your message.
Call Us
(+44) 7776 190 340